First Available Path: Difference between revisions

From Planimate Knowledge Base
Jump to navigation Jump to search
m (Created)
 
mNo edit summary
Line 1: Line 1:
<onlyinclude>The switch selects the path with the lowest path number that is available. </onlyinclude>
<onlyinclude>The switch selects the path with the lowest path number that is available. </onlyinclude>  


When an item looks through the switch to determine a path to take, the switch first determines which paths are available to be taken. The switch then selects the path with the lowest path number.
When an item looks through the switch to determine a path to take, the switch first determines which paths are available to be taken. The switch then selects the path with the lowest path number.  
 
If you think it is possible that ALL paths could be blocked when an item looks through the switch, you will need to select the Gating option “Switch can Block Items”, to avoid a run-time error.
 
Read more about [[About Gating Options|Gating Options]].
 
<br>


[[Category:Object/Switch]]
[[Category:Object/Switch]]

Revision as of 17:22, 16 January 2009

The switch selects the path with the lowest path number that is available.

When an item looks through the switch to determine a path to take, the switch first determines which paths are available to be taken. The switch then selects the path with the lowest path number.

If you think it is possible that ALL paths could be blocked when an item looks through the switch, you will need to select the Gating option “Switch can Block Items”, to avoid a run-time error.

Read more about Gating Options.