Out Routines and Track Loops: Difference between revisions

From Planimate Knowledge Base
Jump to navigation Jump to search
No edit summary
No edit summary
Line 9: Line 9:
[[Category:Routine]]
[[Category:Routine]]
[[Category:Track/Loop]]
[[Category:Track/Loop]]
[[Category:Out Routine]]
<font size="2">idkbase note 118</font>
<font size="2">idkbase note 118</font>

Revision as of 22:21, 10 January 2008

Track loops have an option to call the out routine immediately after the train starts to leave rather than after the train completes its exit delay.


This enables the Out Routine to be used to set up the exit delay.


Having this option enabled is also important if you want Out Routine to access the movement times logged by Planimate 5.02c.


idkbase note 118