Out Routines and Track Loops: Difference between revisions
Jump to navigation
Jump to search
mNo edit summary |
mNo edit summary |
||
Line 1: | Line 1: | ||
Track loops have an option to call the out routine immediately after the train starts to leave rather than after the train completes its exit delay. | Track loops have an option to call the out routine immediately after the train starts to leave rather than after the train completes its exit delay. | ||
This enables the Out Routine to be used to set up the exit delay. | This enables the Out Routine to be used to set up the exit delay. | ||
Having this option enabled is also important if you want Out Routine to access the movement times logged by Planimate 5.02c. | |||
---- | ---- | ||
<font size="2">idkbase note 118</font> | <font size="2">idkbase note 118</font> | ||
[[Category:Routine]] | [[Category:Routine]] | ||
[[Category: | |||
[[Category:Obsolete]] |
Revision as of 14:55, 3 November 2008
Track loops have an option to call the out routine immediately after the train starts to leave rather than after the train completes its exit delay.
This enables the Out Routine to be used to set up the exit delay.
Having this option enabled is also important if you want Out Routine to access the movement times logged by Planimate 5.02c.
idkbase note 118