Replacing objects under model control using the REPLACE operation

From Planimate Knowledge Base
Revision as of 09:20, 10 January 2008 by Rick (talk | contribs) (Importing text file)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

- Added new dynamic object operation: REPLACE (command code of 3)


In this mode, _original_id specifies the object ID of the original to copy
and _new_id must be set to specify the object ID of the object that will
be replaced.


The new object will hence get the ID _new_id.


The _x,_y and _new_panel columns are ignored in this mode.



idkbase note 48