Section Running Times
Jump to navigation
Jump to search
Line 1 / Line 2 etc.
These are the times that a Item Class (representing a Train of some sort) will take to traverse that Line number (road) of the section.
Section Times are set individually for each Item Class, unless a Section Running Table in an automatically-generated network is being used.
idkbase note 10007