Setting the Run Start Time Dynamically: Difference between revisions

From Planimate Knowledge Base
Jump to navigation Jump to search
m (1 revision(s))
No edit summary
 
Line 1: Line 1:
<font face="Arial">The run start time for a model can be set dynamicall using the set operation and the system -&gt; time -&gt; Run Start Time Reference.<br /> Setting this value will restart the model so you will lose all instructions<font face="MS Sans Serif"><br /> </font></font>
The run start time for a model can be set dynamicall using the set operation and the system -&gt; time -&gt; Run Start Time Reference. Setting this value will restart the model so any other scheduled activity will not occur.
----
----
[[Category:Editing]]
[[Category:Editing]]
[[Category:Runtime Engine]]
[[Category:Runtime Engine]]
[[Category:Time]]
[[Category:Time]]
[[Category:Bug Report]]
<font size="2">idkbase note 117</font>
<font size="2">idkbase note 117</font>

Latest revision as of 20:17, 10 January 2008

The run start time for a model can be set dynamicall using the set operation and the system -> time -> Run Start Time Reference. Setting this value will restart the model so any other scheduled activity will not occur.


idkbase note 117